Renovation budget calculator
The renovation budget calculator turns a list of materials, labor, fixtures, rentals, and other project expenses into one practical spending target.
Run — free
Enter each quantity with its matching unit price, then choose a contingency percentage for surprises that may appear after work begins. The result shows every line cost, the itemized subtotal, the contingency allowance, and the final project total. It is useful for early planning, contractor quote comparisons, scope revisions, and repeatable budget calculations through the API.
Build an itemized renovation estimate
Start by creating one row for every cost you can reasonably identify. Materials might be measured by square foot, box, sheet, gallon, fixture, or individual unit, while labor might be entered by hour, day, or fixed job. The quantity and unit price on a row must use the same basis: flooring measured in square feet needs a price per square foot, and twenty-four electrician hours need an hourly rate. When a supplier quotes a package, divide its price by the package size if your quantity uses smaller units, or enter the number of complete packages you expect to buy. Names are optional but strongly recommended because they make the returned breakdown easier to review. Keep all monetary values in one currency, since the calculator does not identify or convert currencies. Include permits, delivery, equipment rental, disposal, design fees, and tax as separate rows when they belong in your project scope. A thorough list produces a more useful subtotal than one broad construction estimate that hides assumptions.
Understand subtotal, contingency, and project total
For each row, the calculator multiplies quantity by unit price. It adds those line costs to create the itemized subtotal, then multiplies that subtotal by the contingency percentage to calculate the contingency amount. Finally, it adds the allowance to the subtotal to produce the project total. For example, a subtotal of 20,000 with a 10 percent contingency creates a 2,000 allowance and a 22,000 total. Contingency is not a prediction that every extra dollar will be spent. It is a planning reserve for uncertain quantities, concealed damage, modest price movement, or small scope corrections. Choose the percentage according to how well the work is defined and how much of the building is visible before construction. A zero percentage is valid for comparing raw itemized quotes, while a larger percentage can reflect an early concept with more unknowns. The response preserves each normalized input and line cost, making the arithmetic easy to audit or reproduce in another worksheet.
Use the total without mistaking it for a final quote
Treat the calculated project total as a budget model based on the rows you supplied, not as a contractor commitment, appraisal, or guarantee. Check whether quotes include tax, delivery, demolition, cleanup, permits, temporary protection, and finishing work before comparing them with your estimate. Avoid counting the same expense twice, such as including waste inside a flooring quantity and again as a separate waste line. When the design changes, duplicate your input, revise only the affected rows, and compare the old and new totals so the cost of the decision remains visible. As invoices arrive, replace estimated quantities or prices with actual figures and keep contingency separate from committed spending. The deterministic calculation has no network calls, live price database, randomness, or time-dependent values, so identical inputs always return identical results. The browser version is useful for interactive planning, while the API costs $0.002 per request and can place the same calculation inside estimating forms, homeowner portals, or project-management workflows.
What you can do with it
Plan a room renovation
Combine flooring, paint, fixtures, labor, disposal, and permits into one budget that includes a reserve for surprises.
Compare contractor scopes
Normalize quantities and unit prices from competing estimates, then apply the same contingency percentage to each scenario.
Track a revised design
Recalculate the total after changing finishes or quantities and show how the revised line items affect the project allowance.
FAQ
What does one calculation cost?
The API price is $0.002 per request. The calculator can also run free in your browser.
How is the renovation subtotal calculated?
Each line cost equals its quantity multiplied by its unit price. The subtotal is the sum of all line costs.
How is contingency added?
The subtotal is multiplied by the contingency percentage to find the allowance, and that allowance is added to the subtotal.
What contingency percentage should I use?
Choose a percentage that reflects uncertainty in your specific project. Early designs and concealed conditions generally contain more unknowns than a fully documented scope.
Does the calculator provide current material or labor prices?
No. You supply every quantity and unit price. The calculator performs deterministic arithmetic and does not query a pricing database.
For developers — API access
Everything on this page is available programmatically. This section is for teams who want to wire it into their own systems; everyone else can just use the tool above.
API endpoint
Prefer to automate it? One authenticated POST creates the task; the result comes back by webhook or a signed link. The same capability also runs here on the web, by email and from Telegram — and soon from our app too.
Call it from your stack
curl -X POST https://api.kit.forhosting.com/home/renovation-budget \
-H "Authorization: Bearer $KIT_KEY" \
-H "Content-Type: application/json" \
-d '{"items":[{"name":"Flooring","quantity":45,"unit_price":38.5},{"name":"Paint","quantity":12,"unit_price":42},{"name":"Electrical labor","quantity":24,"unit_price":85}]}'const res = await fetch("https://api.kit.forhosting.com/home/renovation-budget", {
method: "POST",
headers: {
"Authorization": `Bearer ${process.env.KIT_KEY}`,
"Content-Type": "application/json"
},
body: JSON.stringify({
"items": [
{
"name": "Flooring",
"quantity": 45,
"unit_price": 38.5
},
{
"name": "Paint",
"quantity": 12,
"unit_price": 42
},
{
"name": "Electrical labor",
"quantity": 24,
"unit_price": 85
}
]
})
});
const { task_id } = await res.json();import os, requests
res = requests.post(
"https://api.kit.forhosting.com/home/renovation-budget",
headers={"Authorization": f"Bearer {os.environ['KIT_KEY']}"},
json={
"items": [
{
"name": "Flooring",
"quantity": 45,
"unit_price": 38.5
},
{
"name": "Paint",
"quantity": 12,
"unit_price": 42
},
{
"name": "Electrical labor",
"quantity": 24,
"unit_price": 85
}
]
},
)
task_id = res.json()["task_id"]<?php
$res = file_get_contents("https://api.kit.forhosting.com/home/renovation-budget", false, stream_context_create([
"http" => [
"method" => "POST",
"header" => "Authorization: Bearer " . getenv("KIT_KEY") . "\r\nContent-Type: application/json",
"content" => '{"items":[{"name":"Flooring","quantity":45,"unit_price":38.5},{"name":"Paint","quantity":12,"unit_price":42},{"name":"Electrical labor","quantity":24,"unit_price":85}]}',
],
]));
$task = json_decode($res, true);body := bytes.NewBufferString(`{"items":[{"name":"Flooring","quantity":45,"unit_price":38.5},{"name":"Paint","quantity":12,"unit_price":42},{"name":"Electrical labor","quantity":24,"unit_price":85}]}`)
req, _ := http.NewRequest("POST", "https://api.kit.forhosting.com/home/renovation-budget", body)
req.Header.Set("Authorization", "Bearer "+os.Getenv("KIT_KEY"))
req.Header.Set("Content-Type", "application/json")
res, _ := http.DefaultClient.Do(req)Example request
{
"items": [
{
"name": "Flooring",
"quantity": 45,
"unit_price": 38.5
},
{
"name": "Paint",
"quantity": 12,
"unit_price": 42
},
{
"name": "Electrical labor",
"quantity": 24,
"unit_price": 85
}
]
}Example response
{
"task_id": "tsk_a1b2c3d4e5f6a1b2c3d4e5f6",
"type": "home.renovation_budget",
"status": "queued",
"_links": {
"result": "/tasks/tsk_…/result"
}
}The API is asynchronous: the call returns a task_id immediately and the result arrives by webhook. Polling is capped at 1 req/s per task.
Pricing
Published price — no tokens, no invented credits. A failed task is never charged.
Limits
min_items | 1 |
max_items | 200 |
max_value | 1000000000000 |
max_contingency_percent | 100 |
Errors
| HTTP | Code | Meaning |
|---|---|---|
401 | unauthorized | Missing or invalid API key. |
402 | insufficient_balance | Your balance doesn't cover the task price. |
404 | unknown_type | That task type doesn't exist. |
429 | rate_limited | Too many requests. Use the webhook instead of polling. |